Sterling - Cost & Carbon Estimating
Cost & Carbon estimating and forecasting solution.

Problem Addressed
Sterling addresses the disconnect between cost and carbon estimation and forecasting on construction projects.
Case Study
Rapid DCS has been implemented on a range of projects, including for the following asset types:
- Small Housing Development – Kent Contractor
- Bridge – Tier 1 Contractor
- Hospital – Tier 1 Contractor
- Residential Block Refit – Essex Contractor
Related
NAP3 Policy Scorecard
New analysis published by UKGBC on ‘Nature Day’ at COP28 concludes that the UK’s built environment is severely under-equipped to adapt to our changing climate.

Whole Life Carbon Roadmap Progress Report
An update on the built environment sector’s progress towards meeting our net zero trajectory, launched at COP28.

Database on residential properties
Extensive dataset of homes helping local authorities and businesses develop retrofit and social programmes.

Material Passport Platform
Resource promoting material reuse in the built environment through the use of material passports, circular signatures for buildings, a digital bank of materials, and a reuse library.
